牵引变电所
6.1 一般规定
1 全线牵引供电系统方案示意图及设计说明书;
2 牵引变电所主接线图、电气总平面布置图、基础平面布置图、防雷接地装置平面布设图等一二次施工图册,户内外电气装置安装图册,所用电交直流系统图册,电缆清册,在线监测系统图册,继电保护整定计算书;
3 采用标准图、通用图;
4 与土建、房建、通信、信号、电力、接触网、远动专业工程的施工接口设计文件;
6 Traction Substation
6.1
General Provisions
6.1.1
Traction substation project should include the following construction and
design documents:
1. Schematic and
design specifications for traction power supply system.
2. Primary and
secondary construction diagrams, such as, Traction Substation main wiring
diagrams, general electrical layout diagrams, foundation layout diagrams,
lightning protection and grounding equipment layout diagrams, indoor and
outdoor electrical equipment installations diagrams, AC-DC power system
diagrams, cable inventory, on-line monitoring system diagrams, relay protection
setting calculations.
3. Standards and
general diagrams.
4. Construction
interface design documents for civil engineering, building construction,
telecommunications, signal, power, catenary and telecontrol.
5. Proposed
budget and construction drawing budget.
6.1.2
When the civil engineering and building works of the Traction Substation are
under construction, electrical installation unit should cooperate closely with
civil engineering and housing construction unit and the engineering interface
conditions should meet relevant technical standards and mutual confirmation is
advised.
6.1.3 During the
Traction Substation construction, entry and unpacking record of equipment
should be prepared, concealed works installation records, equipment
installation and commissioning records and quality inspection records after the
completion of each process should also be prepared.